Quality System and Test Data

Quality in LED strip is mostly a measurement discipline: what is tested, how often, and whether the record survives to the reel label. This page states all three.

Summary

HFY LED operates under ISO 9001:2015 with 100% reel-level electrical testing, 24-hour burn-in at rated current, spectroradiometer binning to SDCM ≤ 3 and pressure testing of every outdoor assembly. LM-79 reports, LM-80 data and TM-21 projections are issued per family or die type, and lot records are retained for five years so a replacement reel can be matched to an existing installation.

Test plan

StageWhat is checkedFrequency
Incoming dies and FPCForward voltage, wavelength bin, copper weight, solderabilityEvery lot
Die bondingPlacement accuracy, die shear, phosphor thicknessEvery panel, SPC charted
SMT assembly3D paste inspection, AOI for offset and tombstoning100% of panels
Extrusion and sealingProfile tolerance, end-cap bond, pressure at 0.3 bar100% of outdoor assemblies
Electrical testForward voltage, current draw, open segments100% of reels
Burn-in24 hours at rated current, flux drop at end of run100% of reels
BinningChromaticity, flux and voltage per reel100% of reels

Test and measurement equipment

  • Koh Young KY8030 — 3D solder paste inspection, ±1 µm height, —
  • Everfine HAAS-2000 — Spectroradiometer with 1 m sphere, ±2% flux, ±0.001 duv, 380–780 nm at 1 nm
  • Custom reel tester — Automatic electrical test, ±0.5% V and A, Reel up to 50 m
  • Custom pressure rig — IP67 pressure test, ±0.01 bar, 0.3 bar
  • ESPEC TSA-71 — Thermal shock chamber, ±1 °C, −40 °C to +125 °C

Documentation supplied

  • Lot certificate with bin code, flux, forward voltage and burn-in record
  • CE-EMC certificate psi2506093-C01-E01 covering 29 listed models
  • RoHS documentation per production lot (certificate MTL25061108621R)
  • LM-79 photometric report and IES file for each family
  • LM-80 data with TM-21 projection per die type
  • IP67 pressure test record for sealed assemblies

Certifications

CE — EMC Directive 2014/30/EULED Strip (LED Neon Strip), 29 listed HFY models
Tested to EN IEC 55015:2019+A11:2020, EN IEC 61547:2023, EN IEC 61000-3-2:2019+A1:2021+A2:2024 and EN 61000-3-3:2013+A1:2019+A2:2021. Issued 4 July 2025. Certificate PDF available for download below.
RoHS 2.0 — 2011/65/EU Annex IILED Strip (LED Neon Strip), 29 listed HFY models
Tested per IEC 62321 series (3-1, 4, 5, 6, 7-1, 7-2, 8) as amended by (EU) 2015/863 and (EU) 2017/2102. Issued 24 June 2025. Certificate PDF available for download below.
LM-80 / LM-79 test dataLumen maintenance and photometric data for strip families
LM-80 package data, LM-79 reports and TM-21 projections are shared per project on request.
UL / cULusNorth American market, applied for together with the customer
We support joint UL/cULus applications for OEM programmes rather than claiming a standing listing.

Both certificates are downloadable from the downloads page together with the certificate PDFs.

Models listed on the CE and RoHS certificates

The 29 models below are the ones listed on certificate psi2506093-C01-E01 and MTL25061108621R. Certificate coverage follows the listed model and its tested configuration — order-specific configurations are confirmed against the report before shipment.

HFY-2835HFY-3528HFY-5050
HFY-2216HFY-3014HFY-5630
HFY-3030HFY-2835-T30DHFY-2835-T42D
HFY-2835-T60DHFY-2835-S60DHFY-2835-S72D
HFY-2835-S96DHFY-2835-S100DHFY-2835-108D
HFY-2835-S120DHFY-2835-Z30DHFY-2835-Z60D
HFY-2835-Z90DHFY-2835-Z120DHFY-2835-H28D
HFY-5050-Z30DHFY-5050-Z60DHFY-5050-Z90D
HFY-5050-S30DHFY-5050-S60DHFY-3030-Z28D
HFY-3030-Z48DHFY-3030-Z60D

What inspection cannot do

Two things are worth stating plainly. First, a spectroradiometer cannot improve a strip: if the phosphor process drifts, binning only sorts the output into bins that nobody wants. The corrective action is at die bonding, not at measurement. Second, a 24-hour burn-in cannot catch a design fault that takes 500 hours to appear — which is why new die types run 1,000 hours before they are released.

The process detail behind these numbers is on the quality and testing capability page, and the theory behind the life figures is in LED strip lifetime.

Send a specification, get a quotation in 24 hours

Tell us the product type, run length, wattage, CCT, CRI and IP rating. You will receive a fixed price, a lead time, and the feed and driver arrangement in writing — no obligation, and no sales call unless you ask for one.